CALGARY, Alberta (Reuters) - Enbridge Inc said on Saturday it shut down an oil pipeline for an undetermined period on its Canada-U.S. export system after a fire ignited at a pumping station in Illinois.
Enbridge said it was forced to shut down the 318,000 barrel-a-day pipeline between Superior, Wisconsin, and Griffith, Indiana, known as 14/64, after a vehicle collision caused a fire and spill of crude oil near New Lenox, Illinois.
The company has slowed the flow of oil in two pipelines in Canada that feed supply into the system at Superior, the company said.
(Reporting by Jeffrey Jones; Editing by Peter Cooney)
Relacionados
- Sanidad ofrece 13.500 plazas en balnearios a precio especial y sin coste para la Administración regional
- El PSOE critica el nombramiento de un director general de Interior en el Ayuntamiento con un coste anual de 13.000 euros
- Economía/Motor.- Nissan revivirá la marca de bajo coste Datsun para su comercialización en mercados emergentes
- Nissan planea lanzar vehículos de bajo coste con su vieja marca Datsun
- ERC pregunta en el Congreso por el coste de la declaración de Urdangarin